• CLIENT: Pierse Construction
  • VALUE: €2 million
  • DATE: Oct 2007 - May 2008
  • LOCATION: Cork

Concrete structural frame for 6 to 7 Storeys extension onto the main hospital, The works consisted of 1 level of floor below ground level and 6 to 7 floors above ground, the building covers 20,000m2 approx and is linked to the existing hospital by structural steel link bridges.